Congress MLA from Surajgarh, Shravan Kumar talking to CM on the phone.
Congress MLA Shravan Kumar from Surajgarh (Jhunjhunu) has praised Chief Minister Bhajan Lal Sharma. He has described CM Bhajan Lal as the god of Kalyug.
,
The MLA said- You (CM) have done the work that no one can do on earth. I will be grateful to you throughout my life.
In fact, for Surajgarh and Udaipurwati assembly constituencies of Jhunjhunu district, on Friday, a budget of Rs 1092 crore of Kumbharam lift canal project was approved and issued a work order.
After this, on Saturday, 6 -time MLA Shravan Kumar called the CM from mobile from his residence. This video of his talking to CM came out on Sunday.
It is seen in the video that they are talking to CM by turning on loudspeakers.
MLA Shravan Kumar thanked CM on mobile phone …

Congress MLA from Surajgarh, Shravan Kumar thanked the Chief Minister after the budget approval.
‘You have done the work that no one can do on earth’ MLA Shravan Kumar told the CM over the phone- I thank for this historic decision. You have done the work that no one can do on earth.
The project is a boon for both Surajgarh and Udaipurwati assembly constituencies. The Chief Minister replied- I soon call you to meet.

The area facing drinking water crisis will get relief MLA Shravan Kumar told Bhaskar- This area has been struggling with drinking water crisis for years. In summer, water crisis occurs at its peak.
The common man has to face heavy problems. As soon as this project is completed, a permanent solution to this problem will be possible.
He appreciated the leadership of the Chief Minister and the readiness of the government and said- this decision has been taken by understanding the basic need of the public. Which reflects the sensitivity of the government.

The Kumbharam lift project was announced during the second term of former CM Ashok Gehlot (2008-2013).
2 towns and 285 villages will get water The Chief Engineer of the Zaika Funded Project of PHED issued a work order of the project to Larsen and Tourbow (L&T) company on Friday under the Water Life Mission. With this, drinking water will be provided to Udaipurwati and Surajgarh towns and 285 villages. A total approval of a total of 1 thousand 92 crore 22 lakh has been issued. Out of this, Rs 1 thousand 23 crore 72 lakh is the cost of project construction. While the cost of operating the scheme of Rs 68 crore.
Project work will be completed in 2 years The Kumbharam lift canal project has been targeted to complete the work in the next 2 years. Under this, incomplete works will also be included under the Water Life Mission.
This will improve water supply situation in the entire region. This project will ensure adequate drinking water system in the villages and towns of Surajgarh and Udaipurwati.

The picture is of the assembly session of March this year, when Surajgarh MLA raised the issue of water.
Said in the assembly- I will sacrifice life In March this year, in the third session of the assembly, Surajgarh MLA Shravan Kumar raised the issue of water need in Jhunjhunu. He surrounded the Minister of Water and the BJP government over the issue of water in the assembly.
During this, he had said that Jhunjhunu district is a district of brave martyrs who sacrificed their lives to protect the country. In such a situation, it is the responsibility of the government that the people of the district get sweet water. He said- If Surajgarh assembly constituency does not get water till 2026, then I will agitate and sacrifice life.
The project was built during the second term of Gehlot government During the second term of Ashok Gehlot (2008-2013) in the state, the budget announcement was made to bring the water of Kumbharam lift canal. The state government and Udaipurwati MLAs changed in the 2013 assembly elections. The project work stopped on this. During 2013-2018, the then Chief Minister Vasundhara Raje again announced the budget, but the work could not start.
